As it was low tide, the dredge D6 was not operating since everything is still beaching at low tide. At high tide this morning however, the scow HD-8 has been moved from the Meteghan wharf and is now alongside the Saulnierville wharf. There's been rumors that the sediment at the end of the breakwater onward is harder sediment and might require a different bucket.
The new pump house for Comeau's Seafoods is coming along, construction began in the middle of July.



No comments:
Post a Comment